Apply
Before you submit your application
1
2
3
4
If the permit is related to construction activities, the following pieces of documentation must be supplied with the application for a Tree Work Permit: 1) a letter stating the intent of the project, why tree work needs to be completed, and the project's Department of Buildings Job Number; 2) a pre-construction survey and / or layout of existing conditions illustrating the tree location(s); 3) a project design plan (14" x 17" drawings are preferred); 4) a Builders Pavement Plan; 5) utility drawings or vault installation drawings (if applicable); 6) site photos; and 7) any other plans that demonstrate the conflict between City trees and the project.
Ready to Apply?
Steps to apply online:
1
Please read the NYC Parks instructions before you apply.
Steps to apply in person:
1
2
3
4
5
6
7
8
Once a final inspection has been requested, a Parks & Recreation Forester will visit the site to ensure that the work was completed in accordance with the Parks Department Standards. If all work is completed to Parks satisfaction, a final sign-off will be issued. If the work is not completed satisfactorily, the tree work will be subject to restitution and penalty at the direction of Parks & Recreation and at the expense of the property owner.